Saturday, November 21, 2026 Independent US tech newsroom
LexxWire US Tech & AI News

Trump Threatens 'Tremendous Tax' on US Firms Building AI Data Centers Overseas

President Trump said Friday that US companies building AI data centers outside the country will face a “tremendous tax,” warning that the facilities powering the AI boom must stay in America. Full story in slides above — Sources: Reuters, The Wall Street Journal, Al Jazeera, USA Today, November 20-21, 2026.

November 21, 2026 · 1 min · 50 words · LexxWire Desk
A massive AI supercomputing campus under construction at dusk with rows of server buildings and power lines in a news illustration

SpaceX Plans $74 Billion AI Data Centers in Texas and Arizona

SpaceX AI data centers are about to get a lot bigger. The company said on Thursday it plans to spend more than $74 billion on two supercomputing campuses, one at its Starbase rocket site in Texas and one in Cochise County, Arizona, in a bet that its AI business is now as important as its rockets. The numbers are hard to ignore. SpaceX expects to spend more than $24 billion at Starbase and roughly $50 billion in Arizona, it said in a statement, Reuters reported. The Wall Street Journal also reported the $74 billion figure. Both projects still need local approval, and both face votes on December 9. ...

November 13, 2026 · 5 min · 982 words · 

Anthropic Spent $3.4B on Gas Generators to Power Its AI Data Centers

Anthropic has reportedly struck a deal worth about $3.4 billion to secure gas-fired power generators for its AI data centers, buying 1.7 gigawatts of heavy-duty generators in late September from Texas-based OnePWR Solutions, per the Financial Times. Full story in slides above — Sources: Financial Times via Reuters, November 8, 2026.

November 9, 2026 · 1 min · 51 words · LexxWire Desk
Rows of industrial gas generators and power equipment at an energy facility, illustrating Anthropic's reported deal to power its AI data centers

Anthropic Spends $3.4 Billion on Gas Generators to Power AI Data Centers

Anthropic has a power problem, and it just spent $3.4 billion trying to fix it. The Financial Times reported on Sunday that the company behind Claude struck a deal in late September to secure 1.7 gigawatts of gas-fired generators for its AI data centers, taking over generator orders placed by a Texas equipment supplier. If the report holds up, it’s one of the clearest signs yet that the AI race has a new bottleneck, and it isn’t chips. ...

November 9, 2026 · 6 min · 1187 words · 

Marvell Bets $115 Billion on the Light Inside AI Data Centers

Marvell Technology announced November 2 that it will acquire Lumentum in an all-stock deal with an implied enterprise value of $115 billion, aiming to pair its chips with Lumentum’s lasers and optical parts for AI data centers. Lumentum shareholders would receive 4.5 Marvell shares per share, Marvell holders would own about 67% of the combined company, and closing is expected in the first half of 2028, subject to shareholder and regulatory approvals — even as Marvell shares fell about 13% on the announcement. ...

November 3, 2026 · 1 min · 96 words · LexxWire Desk
A row of server racks glowing inside a large Oracle-style cloud data center

Oracle raises $20 billion in stock and bonds to fund its AI data center buildout

Oracle filed on Monday, November 2, 2026, to raise $20 billion from investors to fund its AI data center buildout, splitting the raise evenly between a $10 billion sale of new stock and a $10 billion sale of bonds. Shares fell nearly 6% in Monday trading, Reuters reported, extending a slide of roughly 33% for the year through Friday, October 30. It’s a lot of money to ask for at once, and the market’s answer was blunt. Investors have spent months questioning whether Oracle’s AI spending can pay off fast enough to justify the borrowing behind it, and a $20 billion raise does not settle that question. It sharpens it. ...

November 2, 2026 · 6 min · 1086 words · 
Glowing fiber-optic cables running between server racks inside an AI data center

Marvell Lumentum deal: $115 billion all-stock agreement to buy AI optics maker

Marvell Technology signed the Marvell Lumentum deal on Monday, November 2, 2026, agreeing to buy optical components maker Lumentum in an all-stock transaction with an implied enterprise value of $115 billion. It’s one of the biggest deals of 2026, Reuters reported, and it turns last week’s takeover talks into a signed agreement with a price, a share ratio, and a closing target. Under the terms announced by both companies, Lumentum stockholders will receive a fixed 4.500 Marvell shares for each Lumentum share they own. That works out to about $1,132 per Lumentum share, a 23.9% premium to both companies’ unaffected closing prices on October 28, the last trading day before reports of the talks surfaced. Reuters put the equity value at $102.54 billion; the higher $115 billion enterprise figure includes debt, which is why the two numbers differ. ...

November 2, 2026 · 5 min · 990 words · 
Illustration of a large data center campus under construction in green hills with transmission towers

Nvidia in Talks to Guarantee Billions in Debt for Nscale's West Virginia AI Data Center

Nvidia is in talks to guarantee billions of dollars in debt financing for Nscale’s planned data center campus in West Virginia, a site built for Anthropic, The Information reported Thursday, with Bloomberg later corroborating the report. If it goes ahead, the deal would put the world’s most valuable chipmaker in the unusual position of cosigning a customer’s construction loans. Anthropic has already signed a $44.6 billion contract for the campus’s first building alone, according to Nscale’s IPO filing. That building is planned at 460 megawatts and is expected to run on Nvidia’s next-generation Vera Rubin chips, while the companies are also discussing a second deal worth roughly $45 billion for another building. ...

November 1, 2026 · 5 min · 964 words · 
Glowing fiber-optic cables running between server racks inside an AI data center

Marvell Lumentum Acquisition Talks Put AI Data Center Optics in Focus

Marvell Technology is in advanced talks to buy Lumentum Holdings, Bloomberg News reported Wednesday, citing people familiar with the matter, and the market reaction showed just how large this Marvell Lumentum acquisition could be. Lumentum shares rose about 11% in extended trading after the report, Reuters said, valuing the optics maker at roughly $91 billion at that moment. Marvell shares fell more than 8% in the same stretch. By Thursday early afternoon, the split had widened rather than closed. Lumentum rose about 4% more, while Marvell fell more than 12%, according to Reuters Breakingviews. No deal has been signed, Bloomberg’s report said the talks were still private, and a formal announcement could come as early as next week. Neither company immediately responded to Reuters’ requests for comment. ...

October 29, 2026 · 5 min · 996 words · 

AI's Power Boom: Vertiv and GE Vernova Smash Earnings as Data Centers Demand More Electricity

Vertiv and GE Vernova both beat third-quarter expectations on October 28, 2026, as AI data centers keep driving demand for power, cooling, and grid equipment. Vertiv’s sales rose 61% to $4.31 billion with organic orders up over 100%, while GE Vernova’s orders jumped 96% to $29.3 billion and its backlog hit a record $197 billion. Full story in slides above — Sources: Investopedia, MarketWatch, Barron’s, Morningstar/Dow Jones, October 28, 2026. ...

October 28, 2026 · 1 min · 70 words · LexxWire Desk
Aerial view of modern data center buildings at dusk with server halls glowing, illustrating a planned AI infrastructure investment in Malaysia

SoftBank Plans $50 Billion Malaysia AI and Data Center Investment, Prime Minister Says

SoftBank plans to invest $50 billion in Malaysia. That’s the number Malaysian Prime Minister Anwar Ibrahim put on it on Saturday, October 24, after a video conference with SoftBank founder Masayoshi Son earlier in the week. Anwar said Son had picked out locations for the spending: Kuching, the capital of Sarawak on the island of Borneo, and sites in peninsular Malaysia. The money would go toward artificial intelligence, new technology and data centers, he said, as reported by Bloomberg. ...

October 26, 2026 · 5 min · 1058 words · 
Illustration of silicon wafers and memory chips representing SK Hynix's Solidigm flash-memory business

SK Hynix Scraps Solidigm IPO After Regulators Flag Duplicate Listing Risk

SK Hynix has dropped plans for a US listing of Solidigm, its flash-memory unit, after South Korean regulators warned the deal could shortchange minority shareholders. The chipmaker confirmed the decision in a regulatory filing on Friday, October 23, ending a listing plan that reports had valued as high as $150 billion. Bloomberg first reported the decision on Thursday evening in the United States, and SK Hynix confirmed it in a filing dated Friday in Seoul. That filing said Solidigm had stopped reviewing both a pre-IPO funding round and an initial public offering, citing capital market conditions. ...

October 25, 2026 · 5 min · 974 words · 

Google Just Put AI Chips in Space: Project Suncatcher Explained

Google sent four of its AI chips into orbit on October 1, 2026, as the first flight of Project Suncatcher — a year-long mission testing whether AI data centers could one day run in space. The prototype, built with Planet Labs, will run its TPUs in short bursts while researchers watch how the hardware handles radiation and vacuum conditions. Sources: CNBC via ChosunBiz; Google Research blog via GCN.com; RocketNews; Bytevyte, October 2026. ...

October 21, 2026 · 1 min · 72 words · LexxWire Desk
Aerial view of a modular container-style AI data center complex with Nvidia's DSX POD concept, servers glowing inside

Nvidia's DSX POD Cuts AI Data Center Build Time From Six Months to 14 Days

Six months of construction, fourteen days of hookup. That was the pitch Nvidia CEO Jensen Huang brought to Berlin on Wednesday, and it amounts to the company’s most aggressive move yet against the biggest bottleneck in the AI buildout: the time it takes to actually turn a site into a working data center. The vehicle is Nvidia DSX POD, unveiled at the GTC Berlin keynote on October 21. It’s a reference design for complete Vera Rubin AI factories that partners build inside modular containers. Each container carries computing, networking, cabling, rack-level power, and liquid cooling, all assembled, integrated, and validated in a factory before the unit ever ships. Once it lands, a prepared site just connects power, cooling, and network, and the whole thing can go live in as little as 14 days, down from the six months a traditional onsite build takes. ...

October 21, 2026 · 6 min · 1178 words · 
OpenAI logo beside a large AI data center complex with server racks

OpenAI infrastructure chief Sachin Katti leaves, former xAI exec Ruddarraju takes over

OpenAI’s infrastructure chief is leaving after about a year on the job, and the timing is awkward. Sachin Katti, the executive in charge of OpenAI’s computing capacity, announced Wednesday that he plans to step down next month. His departure lands just as the company ramps up what may be the biggest infrastructure bet in corporate history: roughly $750 billion in spending on computing power through 2030. Katti wrote on LinkedIn that his last day will be November 15 and that he’ll stay on as an adviser. He said he’s leaving to build something new. Uday Ruddarraju, a former xAI executive who became OpenAI’s chief technology officer of compute in July, will take over both the infrastructure and compute businesses and will report to OpenAI president Greg Brockman. ...

October 14, 2026 · 5 min · 1048 words · 

Google Just Locked In 3.6 Gigawatts of Nuclear Power for AI

Google has contracted for 3,590 megawatts of power from Constellation Energy, the largest US nuclear operator, with about a quarter coming from new nuclear capacity added to 11 existing reactors, the companies announced October 6, 2026. Sources: The Hindu (Reuters), ET EnergyWorld (Reuters), Chosun Biz, AI Weekly.

October 11, 2026 · 1 min · 47 words · LexxWire Desk
A SpaceX Starship rocket launching beside stacked Nvidia AI GPU server racks

SpaceX Seeks $40 Billion Apollo-Led Financing to Buy Nvidia AI Chips

SpaceX wants to borrow $40 billion to buy chips from Nvidia. The Financial Times broke the story late Tuesday, and Bloomberg confirmed the talks with its own sources Wednesday morning, in what would rank among the biggest debt financings of the entire AI buildout. The proposed structure is straightforward, if not modest: roughly $10 billion in bank loans plus $30 billion in investment-grade debt, all to pay for one enormous Nvidia chip order. Apollo Global Management is expected to lead the financing and place the debt with a broad group of investors, with bond giant Pimco among the lenders in discussions. The FT put the expected closing in 2027. ...

October 7, 2026 · 5 min · 1030 words · 
A rack of Nvidia AI GPUs inside a dark data center hall with a financial chart overlay

Nvidia's $500 Billion Financing Plan Hits a Wall: Wall Street Wants Bigger Chip Guarantees

Nvidia wants Wall Street to start treating its chips like real estate. Two months into the chipmaker’s most ambitious financing experiment, Wall Street is pushing back, and asking Nvidia to put more of its own money on the line. An Oct. 1 Reuters report found lenders want bigger guarantees than Nvidia originally offered before they’ll treat GPUs as reliable long-term collateral. As of that date, zero transactions had closed under the plan, and some bankers are asking for investment-grade customer contracts or a broader Nvidia guarantee before they’ll fund the loans. ...

October 6, 2026 · 6 min · 1190 words · 
Illustration of an Amazon data center beside a small American town, representing the company's $1 billion community pledge

Amazon pledges $1 billion for data center towns as local opposition grows

Amazon is putting a billion dollars where its data centers are. The company said Friday it will spend more than $1 billion over five years in the US communities that host its data centers, under a new program called “Built Together” — its most direct attempt yet to buy goodwill in towns that increasingly don’t want the giant buildings. The announcement came in a 3,000-word blog post from Matt Garman, the CEO of Amazon Web Services. And it reads less like philanthropy and more like a warning. ...

October 2, 2026 · 7 min · 1286 words · 
Illustration of Nvidia AI server chips in a data center with an Amazon box, representing Amazon's plan to move $8 billion in Nvidia chips to investors

Amazon Plans to Offload $8 Billion in Nvidia AI Chips to Investors, Lease Them Back

Amazon has found a buyer for the most expensive hardware problem in tech. The company is seeking to offload about $8 billion of advanced Nvidia chips to investors through a special-purpose vehicle, then lease the chips back for its own data centers, the Financial Times reported Friday. The proposal, which Reuters also reported, would move thousands of Grace Blackwell chips — installed in more than a dozen US data centers across five states — into a vehicle backed by outside money. Amazon would then pay rent on hardware it currently owns outright. ...

October 2, 2026 · 4 min · 797 words ·